Mt Richon During

 

Removal of the old septic and drainage arrangements required extensive earthworks. A previous owner had directed stormwater into the redundant septic field however the system was never designed for the volume of water entering it during heavy rain. Additionally, a thick layer of clay was preventing effective leaching.